These are HGTD-IJS group meeting pages
https://cern.zoom.us/j/96207798641?pwd=STczWTN5YjFYTmlITFB3bEdPTE1MUT09
F9 internal database:
https://docs.google.com/spreadsheets/d/1um1xUsOMzj5rGVuCReQqf53B1h4MXAHaCTQQISyXkPY/edit#gid=762628997
PQC:
- Continue with setup commissioning - all test structures
Database:
- Upload scripts are up to date and on Github
IT:
- The 3+3 samples have been irradiated to 3e15 and 3.5e15
- Waiting for UBM-ed IHEP samples
- Data quality monitoring has been implemented in the analysis, requires testing and verification
Timing:
- Explore options to improve trigger purity
Long term stability:
- Will be done on UBM-ed samples
- 2+2+2 (0e14, 15e14, 25e14)
- Limits of HV ramp-up speed
Publications:
- Autorship policy for ATLAS preproduction needs to be agreed by Steering/Speakers committee
- HPK HAB ongoing. Need information from HPK about HAB meaning
- IT QC test paper: can be started
Other:
- Try Edge-TCT on QCTS: polishing, optics to be explored. The goal is to measure E-field/gain, also helpful to NIKHEF/Nijmegen HGTD performance simulation (QT Petja)
- 3D RD50 samples: IV tests ongoing, afterwards timing tests
- AIDAInnova testbeam: repair faulty timing boards, determine DUTs