- Indico style
- Indico style - inline minutes
- Indico style - numbered
- Indico style - numbered + minutes
- Indico Weeks View
These are HGTD-IJS group meeting pages
https://cern.zoom.us/j/96207798641?pwd=STczWTN5YjFYTmlITFB3bEdPTE1MUT09
HGTD sample inventory:
https://docs.google.com/spreadsheets/d/13VakRG1eQYrnmJMr7BnfdmC9SSElFxrlI6vjo5_Zdck/edit?usp=sharing
Grafana:
https://grafana-hgtd-sensors-qc.app.cern.ch/dashboards
PQC:
- Full PQC test of at least 1 QCTS per wafer (die #31) from IHEP1 before we irradiate it
- Upload results to HGTD database
Database:
- Test Guilherme's scripts for Sr90 upload
IT:
- HV sparking in hybrids:
- 10 hybrids tested last week by Pau Fuste Martin (4e14, 8e14, 15e14, 7x 25e14)
- 15 min at 600 V + 30 min at 650 V (8 kOhm, 1.5 mA)
- One hybrid wit burn marks on needle contacts, not functional
- One hybrid recovered
- Visual inspection (Google Drive)
- Shipping of UN2910 to IFAE/CNM not practical
- Maybe receive more hybrids for testing
- Do a long run in climate chamber
- Preproduction IRRAD Samples
- it seems we requested 4e14, 8e14 and 12e14 **p/cm2**, not neq/cm2
- tests ongoing, required results:
- IV: Determine (calculate) equivalent fluences, Graph of PIN current vs calculated equivalent fluence, example of PIN current vs Vbias, current vs Vbias in 1x1 LGAD, table of Vbd in 1x1 LGAD
- CV: Graph of Vgl vs calculated equivalent fluence, extract the c-parameter
- TCT: Standard IT tests - graphs of Vgl & Gain vs calculated equivalent fluence, upload to HGTD database
- Sr90: Charge and time resolution vs Vbias, then two summary graphs of charge + timing at operating voltage vs fluence
- Check the time reference performance (low signals MPV 200 mV observed last week)
- Production IHEP1:
- Teach Brigita how to prepare samples for irradiation (pick, pack, label)
- Check storage space for unirradiated samples (Gel paks) and irradiatied samples (bags)
- Standard TCT IT: Die #31 is the main, irradiate also #5 & #48
- TCT should start ASAP
- Report readiness status at Sensor meeting
Timing:
- Voltage steps 400, 450, 500, 550 V, (600 V)
- Set up multichannel system (caen)
Flex Tails:
- none
HGTD detector performance (my limited take):
- GK to deliver scripts to JD for implementation in Athena
Publications:
- Autorship policy for ATLAS HGTD: projects funded with CERN core money have FIRST AUTHOR + FULL HGTD author list
- HPK HAB version 4 - need to implement comments
- IT QC test paper: paper done in-house, now HGTD approving plots, after that HGTD paper approval
- HGTD testbeam paper will require Sr90 data