These are HGTD-IJS group meeting pages
https://cern.zoom.us/j/96207798641?pwd=STczWTN5YjFYTmlITFB3bEdPTE1MUT09
F9 internal database:
https://docs.google.com/spreadsheets/d/1um1xUsOMzj5rGVuCReQqf53B1h4MXAHaCTQQISyXkPY/edit#gid=762628997
HGTD sample inventory:
https://docs.google.com/spreadsheets/d/13VakRG1eQYrnmJMr7BnfdmC9SSElFxrlI6vjo5_Zdck/edit?usp=sharing
Grafana:
https://grafana-hgtd-sensors-qc.app.cern.ch/dashboards
PQC:
- irradiated samples shipped to CERN (1x IHEP 1.5e15, 4x IHEP 2.5e15, 2x USTC 2.5e15) - check status
- van der Pauw measurements (measurement at single bias, typical values: I=10 mA, R=20/0.6/0.01 Ohm):
baseline: test another 6517 as voltage source for vdP. Force voltage, measure current
backup 1: buy another Ke2410
backup 2: ask USP to create a driver for Ke2000 ammeter
backup 3: write a custom script with a driver for Ke220
Database:
- Check how uploading one structure multiple times works
- In Grafana
- add browsing by ATLAS ID
- add flags for non-preproduction measurements
- revise parameter calculations in the database (for example is Vbd correctly extracted)
IT:
- CERN IRRAD: 11 samples prepared and entered into the database. Label and take care of shipping. Prepare few full sensors when available
- 8 samples shipped to FNAL 400 MeV proton irradiation (0e14, 4e14, 8e14, 12e14 - 2 per fluence)
- prepare USTC 15e14 samples for another neutron irradiation
- correlation TCT vs. other methods in the slides
Plan up to mid-June (HGTD PRR?):
- Preproduction samples expected after 6 May - 19 wafers IHEP + 5 wafers USTC (5 samples/wafer)
- Irradiation (2xEoL, 1x15e14 per wafer) - expect samples to return by 20 May
- 21 May is Iskra's thesis topic defense
- Beginning of June is HGTD testbeam at SPS
- 17 June is start of the DRD3 workshop, HGTD PRR will be scheduled end of June
- 18 work days between those dates - we need to measure 24 samples after EoL fluence with TCT and Sr90 and define acceptance criteria
Timing:
- Voltage steps 400, 450, 500, 550 V, (600 V)
- generate charge vs Ileak plots and add data into the database
Long term stability:
- Done successfully with IHEP
- TODO with USTC
Publications:
- Autorship policy for ATLAS preproduction is not yet clarified
- HPK HAB first version completed - BH to review
- IT QC test paper: ongoing. Need an ATLAS note by PRR
Other:
- Try Edge-TCT on QCTS: polishing, optics to be explored. The goal is to measure E-field/gain, also helpful to NIKHEF/Nijmegen HGTD performance simulation (QT Petja)
- 3D RD50 samples: testbeam done at desy AIDAInnova - Feb Week 4. Prepare for analysis. AIDAInnova meeting on 15 March
Summer student projects:
- SiC TCT will be delivered from CNM within RD50
- CdZnTe TCT with 832 nm - test before summer
- DC AC TCT for defect studies
- weighting field simulation in HGTD pixel corner
- 3d measurements with TCT+Sr90