HGTD-IJS meeting
C/0-C084 - F9 seminarska soba
Jamova
These are HGTD-IJS group meeting pages
https://cern.zoom.us/j/96207798641?pwd=STczWTN5YjFYTmlITFB3bEdPTE1MUT09
F9 internal database:
https://docs.google.com/spreadsheets/d/1um1xUsOMzj5rGVuCReQqf53B1h4MXAHaCTQQISyXkPY/edit#gid=762628997
HGTD sample inventory:
https://docs.google.com/spreadsheets/d/13VakRG1eQYrnmJMr7BnfdmC9SSElFxrlI6vjo5_Zdck/edit?usp=sharing
Grafana:
https://grafana-hgtd-sensors-qc.app.cern.ch/dashboards
https://nginx-hgtddb.app.cern.ch/
PQC:
- van der Pauw measurements: setup with Ke220 (single measurement) works well, results same as CERN
- need to implement switching matrix (check if connecting one pad per structure together is ok)
- Residue on one of the needles - try to remove (has this been resolved)?
Database:
- Test Guilherme's scripts for Sr90 upload
IT:
- HV sparking in hybrids:
- Ship tested modules to IFAE contact Sebastian Grinstein
- 10 new modules received: target fluences 4e14, 8e14, 15e14, 7 x 25e14
- IRRAD QCTS received
- CV, TCT and Sr90
Timing:
- Voltage steps 400, 450, 500, 550 V, (600 V)
- Set up multichannel system (caen)
Flex Tails:
- none
HGTD detector performance (my limited take):
- need to prepare implementation for ATLAS Athena to predict detector performance vs position & Lint (Vbias & charge)
- Input t_MC, smearing with noise and time resolution, output t_hit for digitization
- required inputs:
- dE/dx - will try using Athena muon infrastructure which has multiple hits per track
- Lumi profile: each MC campaign present average annual performance (HGTD performance has faster rate of change). Would be convenient ATLAS wide. Work with Data preparation group
Publications:
- Autorship policy for ATLAS HGTD: projects funded with CERN core money have FIRST AUTHOR + FULL HGTD author list
- HPK HAB version 4 - need to implement comments
- IT QC test paper: paper done in-house, now HGTD approving plots, after that HGTD paper approval
- HGTD testbeam paper will require Sr90 data
- received second shipments of run 16069 - CVs in progress
- 1-x (square single), 2-x (hex single), 4-x (hex 5x5), 5-x (square 5x5)
- prepared for irradiations: 5e15 (4-x), 1e16 (4-x, 5-x), 5e15 (4-x, 5-x)
- metalization removal: 4-x, 5-x done, process some 1-x
- prepared for irradiations 8e14, 15e14, 25e14
- testbeam SPS 14-23 April 2025:
- main: V2 TR1 TW3
- secondary: V2 TR1 TW 4,5,7, V1 TR1 TW5
- check equipment list & shifter list
- Received 15, 20 um thick LGADs
- Todo timing unirradiated
- IHEP shipment underway
- Try Edge-TCT on QCTS: polishing, optics to be explored. The goal is to measure E-field/gain, also helpful to NIKHEF/Nijmegen HGTD performance simulation (QT Petja)
- SiC TCT with RD50 CNM - Ajda Osterman
- DC AC TCT for defect studies (start Top-TCT IR with W317, next irradiated, next E-TCT). Try also red light - Marko
- weighting field simulation in HGTD pixel corner
- 3d measurements with TCT+Sr90 (use LGAD for time reference)
- 3d in photovoltaic mode
- MP exploring open source TCAD software