HGTD-IJS meeting
C/0-C084 - F9 seminarska soba
Jamova
These are HGTD-IJS group meeting pages
https://cern.zoom.us/j/96207798641?pwd=STczWTN5YjFYTmlITFB3bEdPTE1MUT09
F9 internal database:
(preprod) https://docs.google.com/spreadsheets/d/1um1xUsOMzj5rGVuCReQqf53B1h4MXAHaCTQQISyXkPY/edit#gid=762628997
(prod) https://docs.google.com/spreadsheets/d/1qijuMoBZnw5EZt8lmTz2q48BkcZ_ctu25dv5TNTIzX0/edit?usp=sharing
HGTD sample inventory:
https://docs.google.com/spreadsheets/d/13VakRG1eQYrnmJMr7BnfdmC9SSElFxrlI6vjo5_Zdck/edit?usp=sharing
Grafana:
https://grafana-hgtd-sensors-qc.app.cern.ch/dashboards
https://nginx-hgtddb.app.cern.ch/
- 50 wafers will be brought to IJS next week
- Positions 5, 30 and 43 will be packed into bags and irradiated
PQC:
SQC:
- \\F9silab05\silab - disk storage\Measurents\Projects\ATLAS-HGTD\Production\automatic_probe_station
- To irradiate to 1e14:
- 1A, 1B1, 2B2
Annealing:
- 5120 min total done, aim for 10-20 kmin total
Database:
- Guilherme's scripts for Sr90 upload tested, testing to see results in Grafana
IT:
Wafer radiation hardness class (A, A'?, B...) to be discussed on Monday sensor meeting
Timing:
- Voltage steps 400, 450, 500, 550 V, (600 V)
Flex Tails:
- no news
Irradiations:
- Leuven ion (EUROLABS until Aug2026)
- Cyric QCTS - next irradiation in June
- Birmingham 26 MeV
Hybrid tests:
- Unirradiated laser tests done with Theo (good job!)
- TODO TCT interpad-gap tests
- Submit ATLAS QT form
- Climate chamber replacement
- Asking Delvotek to convert bond program files
IME-3D:
- Receiving more samples
- Irradiation plan 5e15, 1e16 (reworking challenging)
Publications:
- IT paper published
- HPK HAB version 4 - need to implement comments
- Mixed
- 3D
- HGTD hybrid jitter
3D CNM:
- 1-x (square single), 2-x (hex single), 4-x (hex 5x5), 5-x (square 5x5)
- Gordana requesting more samples
- Need an internal database of samples and their location, fluence
- April 2025 analysis pending
- Oct 2025 SPS testbeam ongoing
https://docs.google.com/spreadsheets/d/1gXOXmDh_rMZvVni9Ns_o9tcRdI506K8smWYKMCjrMm8/edit?gid=0#gid=0
- Received 15, 20 um thick LGADs
- Todo timing unirradiated
- IHEP shipment first TCT done with Chubut
- In the last stage of processing
- Production ongoing
- DC AC TCT for defect studies (start Top-TCT IR with W317, next irradiated, next E-TCT). Try also red light
- weighting field simulation in HGTD pixel corner
- 3d in photovoltaic mode
- MP exploring open source TCAD software