HGTD-IJS meeting
C/0-C084 - F9 seminarska soba
Jamova
These are HGTD-IJS group meeting pages
https://cern.zoom.us/j/96207798641?pwd=STczWTN5YjFYTmlITFB3bEdPTE1MUT09
F9 internal database:
(preprod) https://docs.google.com/spreadsheets/d/1um1xUsOMzj5rGVuCReQqf53B1h4MXAHaCTQQISyXkPY/edit#gid=762628997
(prod) https://docs.google.com/spreadsheets/d/1qijuMoBZnw5EZt8lmTz2q48BkcZ_ctu25dv5TNTIzX0/edit?usp=sharing
HGTD sample inventory:
https://docs.google.com/spreadsheets/d/13VakRG1eQYrnmJMr7BnfdmC9SSElFxrlI6vjo5_Zdck/edit?usp=sharing
Grafana (broken):
https://grafana-hgtd-sensors-qc.app.cern.ch/dashboards
https://nginx-hgtddb.app.cern.ch/
http://hgtd-pqc-pc-01:8501/
- IHEP Delivery 1.1 (50 wafers): 60 kW, IT done, all passed
- IHEP Delivery 5 (60? wafers): exp. to leave IME in Oct
USTC in kind (85 W, Dec 26)
Spain in kind (50 W each, Feb 27, May 27)
- 160 kmin at 40°C done for CV samples
- 40, 60, 80 °C (3 samples 25e14)
- 40 °C: 4e14, 8e14, 15e14, 25e14 (5 samples)
- 1 min done
SQC:
- Edge potential study by Bor done (4e14 main sensor)
- Potential on the dicing edge very similar to backplane potential
- Next study with 25e14
IT:
- Delivery 4 to be irrad/tested
Database:
- Reprocessing:
- correct irradiation entry
- Ileak move from Vfd to 100 V
Timing:
- Voltage steps 400, 450, 500, 550 V, (600 V)
- Test SC board stability with a pulsar
- Pulse height 8.6 % difference between -30 °C and +20 °C
- REF temperature is about -5 °C during measurement at -30°C
Flex Tails:
- asked Elgoline for quotes
Irradiations:
- Birmingham 22 MeV: done cp = 2.9e-16
- Krakow 60 MeV: done cp = 2.3e-16
- Cyric 70 MeV: ready to start
- UNM/FNAL 400 MeV: awaiting return
- IRRAD 24 GeV: cp = 2.9e-16
Hybrid tests:
- ordering 20 hybrid boards
- Irradiations of B1.2 to 4e14, 8e14, 15e14, 25e14, 30e14 (2/fluence) - samples annealing done
- Tuning & Sparking:
- Jitter measured with laser, sigma 19 ps
- Jitter measured with pulsing on WB hybrids, sigma 17 ps at minimal thr
- Shot noise study - ready to start publication
- Sr90
- see HGTD week report
- Module received, tuning successful
- Changing LV Power supply
- Sr90 performance after init tests
Testbeam:
- AIDAInnova TI-LGAD mar26 analysis ongoing
https://docs.google.com/spreadsheets/d/1gXOXmDh_rMZvVni9Ns_o9tcRdI506K8smWYKMCjrMm8/edit?gid=0#gid=0
- IME3D mar26 analysis ongoing
IME3D:
- 1um electrode 35x35 measurement done
- gain 80-86V
- study long (30 ns) waveform tails (plasma?)
Publications:
- HPK HAB version 4 - need to implement comments
- Mixed: waiting for author list
- 3D - accepted
- HGTD hybrid jitter
3D CNM:
- 1-x (square single), 2-x (hex single), 4-x (hex 5x5), 5-x (square 5x5)
- Received 15, 20 um thick LGADs
- Todo timing unirradiated,
- Back to step 1
- Production ongoing
- DC AC TCT for defect studies (start Top-TCT IR with W317, next irradiated, next E-TCT). Try also red light
- weighting field simulation in HGTD pixel corner
- 3d in photovoltaic mode
- MP exploring open source TCAD software