- IHEP Delivery 1.2 (50 wafers): 66 kW, IT done, all passed
- IHEP Delivery 2 (95 wafers): 63 kW, IT done, B36-W7 & B36-W11 fail TCT gain --> check Sr90
- IHEP Delivery 3 (112 wafers): 63 kW, cooling down
- IHEP Delivery 4 (13 Wafers): irradiation next week
- IHEP Delivery 5 (60? wafers): exp. to leave IME in Oct
 
IHEP in kind (3 del 50+W each: Oct 26, Jan 26, Apr 26)
USTC in kind (85 W, Dec 26)
Spain in kind (50 W each, Feb 27, May 27)
 
Annealing:
- 160 kmin at 40°C done for CV samples
- 80 kmin at 40°C done for TCT samples
- Ajda QT (Batch 33, D2):
    - 40, 60, 80 °C (3 samples 25e14)
    - 40 °C: 4e14, 8e14, 15e14, 25e14 (5 samples)
    - 1 min done
    
PQC:

SQC: 
- Edge potential study by Bor done (4e14 main sensor)
    - Potential on the dicing edge very similar to backplane potential
    - Next study with 25e14

IT:
- Delivery 4 to be irrad/tested

Database:
 
- Reprocessing: 
    - correct irradiation entry
    - Ileak move from Vfd to 100 V

Timing:
- Voltage steps 400, 450, 500, 550 V, (600 V)
- Test SC board stability with a pulsar
    - Pulse height 8.6 % difference between -30 °C and +20 °C
    - REF temperature is about -5 °C during measurement at -30°C

Flex Tails:
- asked Elgoline for quotes

Irradiations:
- Birmingham 22 MeV: 
done cp = 2.9e-16
- Krakow 60 MeV:
done cp = 2.3e-16
- Cyric 70 MeV: ready to start

- UNM/FNAL 400 MeV:
 awaiting return
- IRRAD 24 GeV:
cp = 2.9e-16

Hybrid tests:
- ordering 20 hybrid boards
- Irradiations of B1.2 to 4e14, 8e14, 15e14, 25e14, 30e14 (2/fluence) - samples annealing done
- Tuning & Sparking:
    - Jitter measured with laser, sigma 19 ps
    - Jitter measured with pulsing on WB hybrids, sigma 17 ps at minimal thr
    - Shot noise study - ready to start publication
- Sr90
    - see HGTD week report
- Module received, tuning successful
    - Changing LV Power supply
    - Sr90 performance after init tests

Testbeam:
- AIDAInnova TI-LGAD mar26 analysis ongoing
https://docs.google.com/spreadsheets/d/1gXOXmDh_rMZvVni9Ns_o9tcRdI506K8smWYKMCjrMm8/edit?gid=0#gid=0
- IME3D mar26 analysis ongoing

IME3D:
- 1um electrode 35x35 measurement done
- gain 80-86V
- study long (30 ns) waveform tails (plasma?)

Publications:
- HPK HAB version 4 - need to implement comments
- Mixed: waiting for author list
- 3D - accepted
- HGTD hybrid jitter

3D CNM:
- 1-x (square single), 2-x (hex single), 4-x (hex 5x5), 5-x (square 5x5)

Thin LGAD (Ex-Flu)
- Received 15, 20 um thick LGADs
- Todo timing unirradiated,
 
CNM overdoped LGAD:
- Back to step 1
 
CiS LGAD:
- 
Production ongoing
 
Summer student projects:
- DC AC TCT for defect studies (start Top-TCT IR with W317, next irradiated, next E-TCT). Try also red light
- weighting field simulation in HGTD pixel corner
- 3d in photovoltaic mode
- MP exploring open source TCAD software

 

 

There are minutes attached to this event. Show them.
    • 1
      HGTD production
      Speakers: Ajda Osterman, Bojan Hiti, Brigita Novak, Gregor Kramberger (Jozef Stefan Institute), Iskra Velkovska, Jernej Debevc (Jozef Stefan Institute (SI)), Matic Terglav (IJS)
    • 2
      Hybrids and Modules
      Speakers: Bojan Hiti, Gregor Kramberger (Jozef Stefan Institute), Marko Puklavec (F9)
    • 3
      Testbeam
      Speakers: Ajda Osterman, Bojan Hiti, Gregor Kramberger (Jozef Stefan Institute), Iskra Velkovska (Jozef Stefan Institute (SI)), Jernej Debevc (Jozef Stefan Institute (SI))
    • 4
      R&D
      Speakers: Ajda Osterman, Bojan Hiti, Brigita Novak, Gregor Kramberger (Jozef Stefan Institute), Iskra Velkovska (Jozef Stefan Institute (SI)), Jernej Debevc (Jozef Stefan Institute (SI)), Marko Puklavec (F9)
    • 5
      AoB
      Speaker: Ajda Osterman