HGTD-IJS meeting
C/0-C084 - F9 seminarska soba
Jamova
These are HGTD-IJS group meeting pages
https://cern.zoom.us/j/96207798641?pwd=STczWTN5YjFYTmlITFB3bEdPTE1MUT09
F9 internal database:
(preprod) https://docs.google.com/spreadsheets/d/1um1xUsOMzj5rGVuCReQqf53B1h4MXAHaCTQQISyXkPY/edit#gid=762628997
(prod) https://docs.google.com/spreadsheets/d/1qijuMoBZnw5EZt8lmTz2q48BkcZ_ctu25dv5TNTIzX0/edit?usp=sharing
HGTD sample inventory:
https://docs.google.com/spreadsheets/d/13VakRG1eQYrnmJMr7BnfdmC9SSElFxrlI6vjo5_Zdck/edit?usp=sharing
Grafana:
https://grafana-hgtd-sensors-qc.app.cern.ch/dashboards
https://nginx-hgtddb.app.cern.ch/
- IHEP Batch 1 (100 wafers): IT done
- Batch 1.2 irradiated 1525 s at 66 kW --> all passed
Annealing:
- 160 kmin at 40°C done for CV samples
- 80 kmin at 40°C done for TCT samples
- Plan: systematic 40°C study with Batch 2 samples
SQC:
- Future plans (Matic)?
- \\F9silab05\silab - disk storage\Measurents\Projects\ATLAS-HGTD\Production\automatic_probe_station
IT:
- Batch 2 all good so far
Database:
- regularly upload
Timing:
- Voltage steps 400, 450, 500, 550 V, (600 V)
- Petja:
- Calibration performed 80-90 fC/V with CNM
- Charge dependence on T of USTC W7-50 preprod (107,117,127 V)
- T history seems to affect Q
- Test Q right after cooling down vs. after long thermalization
- Test Q after long thermalization and different biasing time
- Test SC board stability with a pulsar
Flex Tails:
- asked Elgoline for quotes
Irradiations:
- Birmingham 22 MeV: done cp =
- Krakow 60 MeV: done cp = 2.7e-16
- Cyric 70 MeV: sent for July
- UNM/FNAL 400 MeV: awaiting return
- IRRAD 24 GeV: prepare larger sample set
- Leuven ion (EUROLABS until Aug2026) - not
Hybrid tests:
- New chamber installed
- Asked Elgoline for quote for 20 hybrid boards
- Wire bonded and tested (CO2(s)) three hybrids from 2025 sparking tests:
- S35 (first column dig. failure from the start), S12, S13 (both ok)
- S12 developed two noisy pixel on the edge between cold tests 1 & 2 (probably setup/humidity intake related)
- All can be biased to 600 V without noise increase
- Minimal threshold 3.9 fC (below edges become noisy)
- Jitter measured with laser, sigma 19 ps
- Jitter measured with pulsing on WB hybrids, sigma 17 ps at minimal thr
- Shot noise study - ready to start publication
- Irradiations of B1.2 to 4e14, 8e14, 15e14, 25e14, 30e14 (2/fluence) - samples annealing done
- Measurement plan:
- Hybrid I-V
- Sparking test 30e14
- Sr90 efficiency measurement (coincidence REF trigger)
Testbeam:
- AIDAInnova TI-LGAD mar26 done
https://docs.google.com/spreadsheets/d/1gXOXmDh_rMZvVni9Ns_o9tcRdI506K8smWYKMCjrMm8/edit?gid=0#gid=0
- IME3D mar26 done
Publications:
- HPK HAB version 4 - need to implement comments
- Mixed
- 3D - working on response
- HGTD hybrid jitter
3D CNM:
- 1-x (square single), 2-x (hex single), 4-x (hex 5x5), 5-x (square 5x5)
- Received 15, 20 um thick LGADs
- Todo timing unirradiated,
- Back to step 1
- Production ongoing
- DC AC TCT for defect studies (start Top-TCT IR with W317, next irradiated, next E-TCT). Try also red light
- weighting field simulation in HGTD pixel corner
- 3d in photovoltaic mode
- MP exploring open source TCAD software